Zone Substation ‘T’ Re-Built upgrades – 22/11kV
Power System Design has successfully completed the detailed secondary design and commissioning for Zone substation ‘T’ as part of the terminal station Re-Built project. Power System Design was awarded the contract to manufacture / fully configure and Factory Acceptance Test (FAT) the protection and control panels.
The project involved the secondary design and refurbishment for an existing brown field 22/11kV substation as follows:
  • Decommission 1 x 22/11kV power transformer bay;
  • Decommission part of 11kV Switchboard;
  • Establish new 22kV line protection scheme at SUB’T’ to interface to the new terminal station control building;
  • Establish new 22kV line protection scheme at SUB’VR’ to interface to the new terminal station control building;
  • New protection to be installed on existing equipment whilst maintaining supply to customers.


PSD were responsible for the supply of the following services/equipment:

Design
  • Augment existing designs (for SUB’T’ & SUB’VR’);
  • Design of new protection and control schemes (for SUB’T’ & SUB’VR’);;
  • Settings, fault calculations and relay configurations;
  • Commissioning procedures and outage planning.


Supply
  • 2 x 22kV line protection schemes at SUB’T’;
  • 2 x 22kV line protection schemes at SUB’VR’.


Testing / Commissioning
  • Complete protection FAT/SAT testing;
  • Complete commissioning.
Zone Substation ‘T’  Re-Built upgrades – 22/11kV  
« Back to Projects »
Home | About | Services | Portfolio | Projects | Careers | Contact Us | Client Login

Copyright © 2008 PSD Power System Design. All Rights Reserved.
Sydney Web Design & Web Hosting by KayWeb