Monash / Hummocks Capacitor Bank Controller Upgrades
Power System Design has successfully completed the secondary design of new cap bank controllers at both Hummocks/Monash substations. Power System Design was responsible for the supply/on site installation and commissioning of the new cap bank controller scheme at Monash substation.
|