Power System Design is currently busy with the design of the new 33/11kV zone substation. The project involves the primary/secondary design for two new 33/11kV transformers and a new 11kV switchboard.
|
|
|
|
|
|
Power System Design has successfully completed the detailed secondary design and commissioning for Caulfield Zone substation. Power System Design was awarded the contract to manufacture / fully configure and Factory Acceptance Test (FAT) the protection and control and RTU panels.
|
|
|
|
|
|
Power System Design has successfully completed the detailed secondary design for Dandenong Zone substation. Power System Design was awarded the contract to fully configure and Factory Acceptance Test (FAT) the protection and control and RTU panels.
|
|
|
|
|
|
Power System Design has successfully completed the detailed primary/civil and secondary design for East Burwood Zone substation. Power System Design was awarded the contract to manufacture / fully configure and Factory Acceptance Test (FAT) the protection and control panels.
|
|
|
|
|
|
Power System Design is currently busy with the design of the new 11kV/415V infrastructure required at the Jackson Power Plant in order to facilitate connection of a new 11kV gas turbine.
|
|
|
|
|
|
Power System Design has successfully completed the detailed primary/civil and secondary design for Mentone Zone substation. Power System Design was awarded the contract to design the protection and control panels.
|
|
|
|
|
|
Power System Design has successfully completed the secondary design of new cap bank controllers at both Hummocks/Monash substations. Power System Design was responsible for the supply/on site installation and commissioning of the new cap bank controller scheme at Monash substation.
|
|
|
|
|
|
Power System Design is currently busy with the design of the new 11kV/220kV and 11/33kV infrastructure required at Sino Iron Power Plant in order to facilitate connection of 10 new 11kV gas/steam turbines and associated generator transformers.
|
|
|
|
|
|
Power System Design has successfully completed the detailed secondary design and commissioning for Zone substation ‘T’ as part of the terminal station Re-Built project. Power System Design was awarded the contract to manufacture / fully configure and Factory Acceptance Test (FAT) the protection and control panels.
|
|
|